Commit Graph

11 Commits

Author SHA1 Message Date
Dirk Koopman
2c50f9b4b2 new keepalive system + timings for PC92 C recs
Added the new K record for keepalives.
Increased the PC92 C interval to 24 hours.
Increased dependent node C interval to 2 hours.
PC50 can reset obs.
PC50 now routed everywhere without filters except isolation,
this may change back in time, when K record is ubiquitous.

Still need to actually issue K record
2007-09-17 22:44:15 +01:00
Dirk Koopman
fd0a34c34a remove all $Id$ strings 2007-06-24 02:17:43 +01:00
Dirk Koopman
948528bfc0 recover from removal of newline characters! 2007-06-21 15:40:45 +01:00
Dirk Koopman
d2580480d2 Merge branch 'SIMPLEROUTE'
and tag as 1.55

Conflicts:

	.gitignore
	data/.gitignore
	perl/DXProt.pm
	perl/Version.pm
2007-06-21 14:54:07 +01:00
minima
b67b50de92 add more routing code together with associated commands 2001-06-06 13:30:21 +00:00
minima
433205ef66 Increase default hop counts all round 2000-07-30 17:48:06 +00:00
minima
654c9b7742 14. Corrected Pc84/85 handling a bit.
made the auto for/oper optional (and not the default)
2000-07-26 16:24:50 +00:00
djk
69c8aeb338 1. Fixed problems with sh/rcmd (talk/ann/log) with a callsign as argument and
also made what G0RDI wanted work as well!
2. Added isolate flag to allow isolation of different networks at a gateway.
3. Changed make Makefile.PL to perl Makefile.PL in instructions
4. Copied latest instructions to html directory
5. Had another attempt at making clients disconnect without hanging everytime.
6. Changed msg queuing semantics so that the system routes on exact callsign.
7. Changed the protocol version so that it increments with the DXSpider version.
1998-12-20 01:58:04 +00:00
djk
171a7a0bf8 started the addition of help files
implemented a basic help function
added a skeleton DXMsg.pm for message handling in and out
1998-09-28 21:49:56 +00:00
djk
21e7642d21 well on the way to having a working cluster database
can receive spots, talks and announces now
moved the pcnn routines to a new file
1998-07-18 23:05:28 +00:00
djk
1cf4bd14be We have lift off, we are CONNECTED. We aren't doing much but we can
get on and we have a structure in place which is workable. It now needs
fleshing out.
1998-06-22 20:05:22 +00:00